QUALITY

Press Tool Maintenance Checklist: Daily, Regrind and Periodic Checks

November 03, 2026 · Atharva Engineers


Most die breakdowns give warning signs long before they stop the line: rising burrs, a misfeed now and then, a change in the sound of the press. A simple checklist, used every time, catches them early. Copy this into your own check sheet and adjust it to your tools.

Before every production run

  • ☐ Tool number and part drawing revision match the job card
  • ☐ Die set clean; no slugs, scrap or loose items on the die face
  • ☐ Shut height set correctly for this tool
  • ☐ Tool clamped squarely and securely
  • ☐ Strip guides, pilots and lifters move freely
  • ☐ Lubrication applied as specified for the material
  • ☐ Misfeed and part-out sensors working (if fitted)
  • ☐ First-off part checked against the drawing before running

During the run

  • ☐ Burr height checked at set intervals
  • ☐ Critical dimensions checked at set intervals
  • ☐ Listen for changes in press sound; stop and inspect if it changes
  • ☐ Slugs clearing properly; no slug pulling onto the die face

At each regrind

  • ☐ Punches and dies reground to remove wear; record how much was removed
  • ☐ Cutting clearance checked (see the die clearance calculator)
  • ☐ Edges stoned to remove grinding burr
  • ☐ Shims added if needed to restore punch and die heights
  • ☐ Pilots checked for wear and diameter
  • ☐ Springs checked for cracks and loss of force
  • ☐ Stripper plate and guides checked for wear and alignment
  • ☐ Trial strip run and first parts inspected before release

Periodically (for example every few regrinds)

  • ☐ Guide pillars and bushes checked for wear and play
  • ☐ Die set flatness and parallelism checked
  • ☐ Fasteners and dowels checked for tightness
  • ☐ Remaining grind life on punches and inserts reviewed; spares ordered in time
  • ☐ Forming sections checked for wear and galling

What to record on the check sheet

Field Why it matters
Date and stroke count Sets the regrind interval
Burr height before regrind Shows how fast edges wear
Amount ground off Tracks remaining life of each component
Components replaced Shows which positions need spares
Problems seen Reveals patterns: misfeeds, slug pulling, breakage

Over a few months, these records show the right regrind interval for each tool. For high-precision jobs we regrind cutting elements about every 50,000 strokes, but the right figure depends on material, thickness and tolerance.

When the checklist finds a problem

Our guide to common progressive die problems covers the usual causes of misfeeds, slug pulling, burrs and punch breakage.

Need help? Our die maintenance and repair service covers regrinding, clearance correction and replacement punches and inserts cut on CNC wire cut EDM. Send us photos and a description of the problem.

Free calculators: Press Tonnage Calculator Bend Allowance Calculator Die Clearance Calculator
Let's get started

Send Us Your Drawings

Get a technical evaluation and commercial quote within 24 hours.